Plumbing & pools on the Costa Blanca
Costs, permits & tips
Bathroom renovation, a burst pipe, building or maintaining a pool β on the Costa Blanca these are the most common projects after buying a house. This page shows typical costs, the permits you need and what to watch out for day to day.
β¬30β70/h
Plumber hourly rates
β¬3,500+
Complete bathroom from
β¬12,000+
In-ground pool (6x3 m) from
β¬80β150
Pool maintenance per month
Updated 20 November 2026 Β· About the author β
Towns on the Costa Blanca covered by this guide:
Bathroom renovation on the Costa Blanca
The bathroom is often the first room to be renovated after buying a house β and one of the most expensive if you go about it the wrong way.
Complete bathroom renovation
Tiles, shower or bath, taps, WC, washbasin β all from one firm. The most common job after buying a house.
Shower instead of bath
Spanish homes often have older bathtubs. Converting to a walk-in shower saves space and is more comfortable.
Taps & sanitaryware
Replacing the toilet, washbasin and mixer taps β without retiling everything. Cheaper and quick.
Tiles & floors
New tiles over old ones β saves chiselling and cost, as long as the surface underneath is sound.
Water connections & pipes
Older houses often have furred-up or leaking supply pipes. Have them checked before renovating the bathroom.
Water heater
Replacing an electric water heater (termo), retrofitting solar hot water, instantaneous heaters. A common request when moving in.
Bathroom renovation costs β guide prices
| Job | Local / budget |
|---|---|
| Complete bathroom (approx. 6 mΒ²) | β¬3,500β6,000 |
| Fit a shower (instead of a bath) | β¬800β1,500 |
| Tiles over tiles (per mΒ²) | β¬20β35 |
| Taps + WC + washbasin | β¬500β900 |
| Replace water heater | β¬200β350 |
| Plumber (hourly rate) | β¬30β45/h |
* Guide prices for the Costa Blanca, 2026. Always get a written quote (presupuesto).
Pools β construction, renovation & maintenance
With 300+ sunny days on the Costa Blanca, a pool isn't a luxury β it's part of everyday life. What to watch out for when building, renovating and running one.
Building a pool
Concrete in-ground pool, prefabricated shell or natural pool. A building licence from the Ayuntamiento (town hall) is mandatory. Then enter it in the Catastro (land registry).
Pool renovation
Retiling an old pool, renewing the liner, sealing leaks, modernising the equipment.
Pool maintenance
Weekly cleaning, chemicals, filter cleaning. Either yourself or with a service contract.
Pool heating
A heat pump or solar heating extends the swimming season to 10β11 months of the year.
Salt-water system
Gentler on skin and eyes, cheaper to run. Clearly recommended for new pools.
Timer for the pump
The simplest way to cut high electricity bills. The pump runs only as long as needed.
Pool costs β guide prices
| Job | Cost (approx.) |
|---|---|
| In-ground pool 6x3 m | β¬12,000β20,000 |
| In-ground pool 8x4 m | β¬20,000β35,000 |
| Pool renovation (tiles + equipment) | β¬4,000β12,000 |
| Pool heating (heat pump) | β¬2,000β4,000 |
| Retrofit a salt-water system | β¬1,500β3,500 |
| Pool maintenance service | β¬80β150/month |
| Pump timer | β¬60β120 |
A pool not in the Catastro: an expensive surprise when you sell
Many older pools on the Costa Blanca are not registered in the Catastro (the property register used for tax). This comes to light at the latest when the house is sold β and leads to back-payments of IBI (annual property tax) for up to four years plus a regularisation fee from the Catastro. When buying: check that the pool is in the Catastro. When building: have it registered as soon as it's finished.
Plumbing & pools on the Costa Blanca β what you really need to know
Most houses on the Costa Blanca that change hands have at least one bathroom that should be renovated β and a pool that needs maintenance or renovation. Together they're among the most common projects right after buying a property. The challenge: good plumbers and pool specialists are in demand, quotes vary widely, and if you pick the wrong firm you pay too much or wait too long.
In Torrevieja, Orihuela Costa and Guardamar del Segura, the large expat population means many firms are used to international customers. In Elche and inland, local plumbers often work for less and are perfectly adequate for standard jobs. In the north β around DΓ©nia, JΓ‘vea, Calpe and Altea β high-end villas and new-build projects are more common, so there are specialist firms for more demanding bathroom and pool projects.
Something that comes up again and again on the Costa Blanca: the pool isn't set up properly. The pump runs too long or at the wrong time, the chlorine system is oversized or outdated, the water chemistry is off. The result is unnecessarily high electricity bills and a pool that still turns green. With the right settings and maintenance routine this is entirely avoidable β and running costs drop significantly.
Whether it's a bathroom renovation in Torrevieja, building a pool in Calpe, a plumber in Guardamar or a pool maintenance service in Benidorm β quality and price differences between areas are big. Two or three quotes and a written presupuesto including IVA (VAT) are always the right way.
Practical tips
Salt water for new pools
Gentler on the skin, cheaper to run, fewer chemicals. The extra installation cost pays for itself in 2β3 years.
A timer for the pool pump
Run the pump 3β6 h a day in winter, 6β9 h in summer β during the day. A simple timer really saves up to β¬100 a month.
Have the water pressure checked
Spanish mains water often has high pressure (over 6 bar). A pressure reducer protects pipes, taps and the washing machine.
Tiles over tiles
If the surface is sound, laying new tiles directly over the old ones saves chiselling costs and a lot of time.
Permit before building a pool
Get the licence from the Ayuntamiento first, then build. Without a permit you risk demolition orders β even years later.
β¬300 electricity, a pool and a timer β β¬1,200 saved with one phone call
Costa Blanca Β· 2025
A client contacted us with a question we hear more often than you'd think: "Why am I paying almost β¬300 a month for electricity? I was away for a month and a half β and even then a β¬160 bill arrived. I switched everything off before I left."
The cause was quickly found: the pool pump was running round the clock β 24 hours a day, 7 days a week, even while the house was empty. No timer, no control. It's a classic mistake found in many houses handed over with a basic pool installation: the pump runs until someone switches it off by hand β or until the electricity bill arrives.
The rule of thumb in Spain: in winter 3β6 hours a day is enough, in summer 6β9 hours β ideally during the day, so the warmed water doesn't cool down again overnight. Running it non-stop doesn't just hurt your wallet but the pump itself β it wears out faster and has to be replaced sooner.
We sent a specialist round. He fitted a programmable timer, set the run times correctly for the season and checked the overall condition of the pool system. Cost: under β¬100. From the next month the electricity bill was under β¬90.
Around β¬100 saved a month β over β¬1,200 a year. With a timer for under β¬100. Cases like this are typical, because when you move in nobody explains how a Spanish pool system should be run. The tip for anyone moving into a property with a pool: first check the pump run time and timer β before the first electricity bill arrives.
Cause
Pool pump running 24/7 without a timer β even while away
Fix
Programmable timer, correct run times set
Saving
~β¬100/month Β· over β¬1,200 a year
How high is the electricity bill with a pool on the Costa Blanca?
Carlo:The pool pump was running round the clock β 24 hours a day. In Spain, 3β6 hours a day is enough in winter and 6β9 hours in summer. Around β¬100 saved a month β over β¬1,200 a year.
Plumbing & pools: frequently asked questions
How much does a bathroom renovation cost?
Complete bathroom (approx. 6 mΒ²): β¬3,500β14,000 depending on the finish. Cheaper with a local firm, more expensive with a specialist firm but with a guarantee. Always get several quotes.
How much does a pool cost?
In-ground pool 6x3 m: β¬12,000β20,000. In-ground pool 8x4 m: β¬20,000β35,000. Pool maintenance service: β¬80β150/month.
How long should the pool pump run?
Winter: 3β6 hours a day. Summer: 6β9 hours, during the day. A timer (β¬60β120) saves up to β¬100 a month.
Do I need a permit for a pool?
Yes, for in-ground pools. Apply for the licence at the Ayuntamiento, then have the pool entered in the Catastro β otherwise you'll have problems when you sell.
Chlorine or salt water?
A salt-water system (salt electrolysis) costs more to buy, less to run and is more pleasant to swim in. Clearly recommended for new pools.
Plumber in Torrevieja β how do I find a good one?
Ask for references from completed jobs, get a written presupuesto including IVA (VAT) and keep the deposit realistic (max. 30β40%). Compare two or three quotes β hourly rates of β¬30β70 are normal.
Tiles over tiles β does that work?
Yes, if the surface is level and firm. It saves chiselling costs and time. Have a tiler check first.
How much does pool renovation cost?
Old tiles + new equipment: β¬4,000β12,000 depending on size and condition. Renewing a liner is cheaper than completely retiling.
Your new life on the Costa Blanca
From residency and paperwork to finding the right home β our guides are based on 10 years in Spain. New consultation enquiries are currently paused; the consultation page has the details.